Brought in a load of gravel and leveled up the shed. Also sealed up the cabin so we don't have any 4 legged critters living under there. Put the shingles up on the shed as well so that project is off the list. Got done with the other stuff fast enough that I had time to start the shower project. It's framed up and the pavers are down. I'm not happy with how they are sitting right now so I will be pulling them out and leveling better. Over the 4th of July I will be putting up galvanized steel panels and finishing the actual shower setup. 58 gallon rain barrel will collect water from the roof. A DC pump that is solar powered will pump it to a propane on-demand water heater. I did a temporary setup to try it out and it seems to work pretty good. Looking forward to taking showers up there without taking the time to heat the water.
Wednesday, June 22, 2011