Monday, June 28, 2010

Electric is mostly done

Got the inside and outside lights and 4 outlets wired up this weekend. Still have to wire in a ceiling fan and 2 more outlets. We have most of the cracks sealed up with foam. Once all cracks are foamed up will cut off the excess and then apply chinking material between the logs. I have 10 days off over the 4th of July so should get a lot done.





No comments:

Post a Comment